The Modular Bridge System (PSB2), developed for the Netherlands and German Armies, holds three bridges/bridge modules of 9.7 meters each. This enables the laying of several different combinations of bridges: 3 x 9.7 meters; 1 x 9.7 meters, 1 x 18.7 meters; and 1 x 27.7 meters. With a crew of one driver and one operator the bridges can be laid in approximately 3, 5 and 6 minutes respectively. The bridge modules are 4m wide, 0.65m in height and weigh 5000kg each. Carrying capacity allows for MLC 70 Standard Load (tracked vehicles) and MLC 100 Caution Crossing (wheeled vehicles). There are contracts of 35 vehicles for the German Bundeswehr and 14 for the Netherlands.