Designation:

RLS 609 L

Info
Manufacturer: Rheinmetall Defence  
Product type: Turrets  
Name: Remote controlled weapon station  

Cooperation between Rheinmetall Defence and Kongsberg Protech companies covers the development and production of two weapon stations called 609 L and 609 P. They complete the RLS 609 family of weapon stations with light and heavy remotely operated variants. Fire control units, including display and a control handle, form part of the weapon stations, allowing operation under armour protection.

The weapon stations will be able to take the complete range of infantry weapons currently in service with the German armed forces, including 5.56mm, 7.62mm, 12.7mm and 40mm cal. weapons. The weapon station 609 L, with a gross combat weight of about 100 kg, is designed for use on lightweight vehicles, while the weapon station 609 P (with a gross combat weight of about 200 kg) will be able to carry a heavy 12.7 mm machine gun or even a 40mm automatic grenade launcher.

Adapted to specific German requirements

To a large extent, the design is based on reliable, combat-proven KONGSBERG components adapted to specific German requirements, e.g. with regard to weapons and day/night vision sensors. In both weapon stations, the mechanical and electrical interfaces to the vehicle are absolutely identical, enabling very fast integration in any appropriately prepared vehicle. This way Rheinmetall Landsysteme is able to offer complete vehicle systems, including armament both within and beyond the scope of Germany's GFF/GTF programme.

Decrease life cycle costs

An 80% commonality in components and subsystems between the two weapon stations will significantly decrease life cycle costs and facilitate logistical support. Both weapon stations feature a traverse range of n x 360° combined with an elevation range of -9° up to 60°. Several different options (stabilization system, laser rangefinder, etc.) are available, and the systems can be expanded to include a friend/foe identification capability, for example.

In mid May 2006, Rheinmetall Landsysteme announced the interest in participating in the German programme. A German BWB campaign to test different competing weapon station demonstrators is scheduled to start in early July 2006. Selection of a weapon station type for further qualification is expected to occur at the end of 2006 or early 2007.

Deliveries in 2008

First series deliveries are expected to take place in 2008, with a first lot of approximately 300 units; actual demand is deemed to be much higher. Setting their sights beyond the German programme, Rheinmetall Landsysteme and Kongsberg are already planning to cooperate in the world market too.

Specifications:
Property Value
Main weapon caliber (mm)
7.62
Weight (kg)
100
Traverse arc (degree)
360
Depression (degree)
-9
Elevation (degree)
60




Related Articles

Recapitalization of 218 M1A2 Tanks and Related Equipment and Support (16.12.2016)

BAE Awarded Contract to Refurbish CV90 Vehicles for Sweden (01.04.2016)

Rheinmetall creates Europe’s leading producer of military vehicles (01.02.2016)

BAE Delivers ARCHER Artillery System to Sweden (30.09.2015)

FMV receives delivery of the first Archer pieces (25.09.2013)

Patria and Volvo Group join forces to offer life-cycle support services for the Swedish Armed Forces (07.02.2012)

Saab receives significant order to the Carl-Gustaf system (11.03.2011)

BAE Systems Wins GBP5.5 M Infra Red Shell Contract from UK Mod (15.12.2010)

Fast delivery – Norwegian DINGO 2 to Afghanistan three weeks after order (22.11.2010)

Rosoboronexport at Eurosatory 2010 (16.06.2010)

BAE Systems Awarded £135 million Artillery Production Contract (26.03.2010)

BAE Systems Awarded $70 Million Contract To Finalize Artillery Development For Sweden And Norway (16.01.2009)

General Dynamics European Land Systems Awarded Contract for 198 EAGLE IV 4x4 Vehicles for Germany (14.11.2008)

Saab was selected as supplier of the NLAW for the British army (14.11.2008)

GDELS Awarded Contract for First Batch of 25 EAGLE IV 4x4 Vehicles for Germany (21.07.2008)

   
Share...
Printable Version Send by email rss favorite Facebook Vkontakte Twitter Google+
RLS 609 L