|
Product
|
Qnt
|
Manufacturer
|
Customer
|
Value
|
Add Date
(Close Date
)
|
Annual Cost |
? (Ballistic protection) |
|
Radian Inc. |
|
$25,500,000 |
Jun 2005
(Aug 2005)
|
$25,500,000 |
TALON (Robot, Unmanned Vehicle) |
151 |
FOSTER-MILLER, INC. |
|
$26,000,000 |
Apr 2007
(Dec 2007)
|
$26,000,000 |
T-90S (Main battle tank) |
10 |
JSC Research and production corporation UralVagonZavod |
|
$26,000,000 |
Feb 2008
(Dec 2009)
|
$13,000,000 |
T-55AM2 (Modernization of the vehicle) |
132 |
VOP 025 Novy Jicin, s.p. |
|
$26,000,000 |
Jun 1999
(Oct 2002)
|
$6,500,000 |
M151 Protector RWS (Remote controlled weapon station) |
|
Kongsberg Defence & Aerospace AS |
|
$26,000,000 |
Apr 2013
(Oct 2013)
|
$26,000,000 |
M 153 Protector CROWS II (Remote controlled weapon station) |
|
Kongsberg Defence & Aerospace AS |
|
$26,300,000 |
Jan 2011
(Dec 2011)
|
$26,300,000 |
Gladiator TUGV (Robot, Unmanned Vehicle) |
6 |
Carnegie Mellon’s National Robotics Engineering Center - NREC |
|
$26,400,000 |
Feb 2005
(Dec 2006)
|
$13,200,000 |
M151 Protector RWS (Remote controlled weapon station) |
|
Kongsberg Defence & Aerospace AS |
|
$26,500,000 |
Jul 2004
(Dec 2007)
|
$6,625,000 |
Pinzgauer 716 MK (Patrol Vehicle) |
|
BAE Mobility & Protection Systems |
|
$27,000,000 |
Jul 2006
(Jan 2007)
|
$13,500,000 |
T-72M1 (Main battle tank) |
27 |
Beltechexport Company |
|
$27,000,000 |
Jan 2000
(Dec 2000)
|
$27,000,000 |
M60A3 (Modernization of the vehicle) |
108 |
General Dynamics Land Systems - GDLS |
|
$27,000,000 |
Feb 2001
(Dec 2002)
|
$13,500,000 |
OLIFANT Mk2B (Modernization of the vehicle) |
172 |
Denel Vehicle Systems - DVS |
|
$27,300,000 |
Jul 2005
(Dec 2007)
|
$9,100,000 |
Mastiff PPV (Mine protected carrier) |
47 |
Force Protection, Inc. |
|
$27,400,000 |
Apr 2011
(Dec 2011)
|
$27,400,000 |
AGT-1500 (Modernization of engine) |
|
Honeywell Defence Aviation Systems |
|
$27,600,000 |
Jun 2005
(Aug 2006)
|
$13,800,000 |
PMADS (Anti-aircraft defence turret) |
18 |
ASELSAN inc. |
|
$27,700,000 |
Sep 2005
(Dec 2007)
|
$9,233,333 |
RG-32M (Tactical vehicle) |
102 |
Denel Vehicle Systems - DVS |
|
$28,000,000 |
Feb 2005
(May 2006)
|
$14,000,000 |
RG-31 Charger (Mine protected carrier) |
25 |
Denel Vehicle Systems - DVS |
|
$28,000,000 |
Jun 2006
(Nov 2006)
|
$28,000,000 |
AGTS (Gunner's training simulator) |
60 |
Lockheed Martin |
|
$28,600,000 |
Sep 2011
(Dec 2013)
|
$9,533,333 |
M88A2 Hercules (Repair and recovery vehicle) |
11 |
BAE Systems Land and Armament |
|
$28,744,284 |
Apr 2013
(Mar 2014)
|
$14,372,142 |
M109A5 (Self-propelled howitzer) |
60 |
BAE Systems Land and Armament |
|
$29,000,000 |
Aug 2007
(Dec 2007)
|
$29,000,000 |
M151 Protector RWS (Remote controlled weapon station) |
|
Kongsberg Defence & Aerospace AS |
|
$29,440,000 |
Dec 2019
(Dec 2021)
|
$9,813,333 |
M113A2 (Tracked armoured personnel carrier) |
72 |
BAE Systems Land and Armament |
|
$29,700,000 |
Feb 2005
(Nov 2006)
|
$14,850,000 |
? (Cable set) |
500 |
DRS Technologies, Inc. |
|
$30,000,000 |
Oct 2005
(Jul 2005)
|
$30,000,000 |
Archer (Self-propelled howitzer) |
|
Bofors Defence AB |
|
$30,000,000 |
Sep 2006
(Sep 2011)
|
$5,000,000 |
PANDUR (Wheeled armoured personnel carrier) |
21 |
General Dynamics European Land Systems-Steyr GmbH |
|
$30,000,000 |
Mar 2005
(Sep 2007)
|
$10,000,000 |
M113A2 (Tracked armoured personnel carrier) |
128 |
BAE Systems Land and Armament |
|
$30,000,000 |
Feb 2005
(Dec 2005)
|
$30,000,000 |
M113A2 (Tracked armoured personnel carrier) |
158 |
BAE Systems Land and Armament |
|
$30,000,000 |
Feb 1999
(Nov 2003)
|
$6,000,000 |
T-72AG (Modernization of the vehicle) |
60 |
Kharkiv Morozov Machine Building Design Bureau - KMDB |
|
$30,000,000 |
Feb 2009
(Dec 2010)
|
$15,000,000 |
FMTV (Truck) |
185 |
Oshkosh Defense, LLC |
|
$30,463,852 |
Jul 2011
(Aug 2013)
|
$10,154,617 |
ARV (Robot, Unmanned Vehicle) |
|
BAE Systems Land and Armament |
|
$30,900,000 |
Mar 2005
(Mar 2008)
|
$7,725,000 |
|